Letters to the Editor

Sound Transit stand appalling

 

Thanks for the most informative reports in the two recent issues. We are appalled and sad to see the stand of Sound transit on the B2M/C9T option.

The following should be considered:

112th Avenue Southeast was built on a swamp and the Slough runs parallel to it. In 2002 the entire length of Southeast Eighth Street was reconstructed to correct a flooding problem due to unstable terrain. The cost was $2.543 million and the problem was not 100 percent corrected; the area still floods.

This option will require removal of about 1,150 trees, as counted by a neighborhood team, and will finish forever the habitat where we still have ducks and geese crossing 112th.

The elevated route will impact the entire Surrey Downs neighborhood with noise. There will be no mitigation for this. What is wrong with Sound Transit not considering B7 as the less impact on the environment and families?

Ivan J, Jimenez and Frances H, Jimenez, affected neighbors in Surrey Downs, Bellevue

We encourage an open exchange of ideas on this story's topic, but we ask you to follow our guidelines for respecting community standards. Personal attacks, inappropriate language, and off-topic comments may be removed, and comment privileges revoked, per our Terms of Use. Please see our FAQ if you have questions or concerns about using Facebook to comment.
blog comments powered by Disqus

Read the Dec 19
Green Edition

Browse the print edition page by page, including stories and ads.

Browse the archives.

Friends to Follow

View All Updates